Studi dan Rancang Bangun Turbin Aliran Rata Type Turbin Sundermann Sebagai PLTMH pada Aliran Irigasi Selokan Van Der Wijk dan Kali Bedog Kabupaten Sleman Propinsi DIY
INTISARI
Menteri Energi dan Sumber Daya Mineral (ESDM) Republik
Indonesia Purnomo Yusgiantoro, menyatakan bahwa rata-rata kekurangan
pasokan listrik untuk Jawa-Bali sebesar 600 MW perhari dari beban
puncak, dengan defisit sebesar itu, bisa dipastikan pemadaman pasti akan
sering terjadi.
Dari agenda riset nasional(ARN2006–2009) tentang energi baru
dan terbarukan (EBT) yang menguraikan tentang Perpres no 5 tahun 2006
menunjukan adanya upaya peningkatan pemakaian energi terbarukan.
Penelitian ini bertujuan untuk mengetahui potensi sungai natural cokro
bedog dan selokan irigasi vanderwijk jika menggunakan turbin low-
velowcity water seperti type turbin sundermann.
Prinsip kerja turbin aliran rata (low-velocity water) didasarkan
pada debit air (Q), kecepatan aliran air (v) dan kedalaman sungai (h)
untuk sungai yang kedalaman nya melebihi tinggi dari blade maka
penggunaan turbin dengan cara menggantung, Hasil penelitian terhadap
sungai natural cokrobedog didapat (Q) sesaat =1,07 m3/s, (v) = 0,77
m/s,dan (h) =(0.5-08)m. dan pada sungai irigasi didapat data
tersebut,didapat (Q) sesaat = 2,63 m3/s, (v) = 0.82 m/s, dan (h)= (1,5-
1.8) m.
Hasil penelitian menunjukan bahwa potensi sungai natural dapat
dimanfaatkan sebagai pembangkit tenaga listrik dengan menggunakan
turbin low-velocity water,(turbin type sundermann) jika kecepatan aliran
airnya minimal 0,77 m/s, kedalaman min 0.8 m max 0.9 m untuk
mendapatkan daya sebesar 125 watt.
Kata kunci : Debit air sesaat (Q), Kecepatan Air(v), Kedalaman
Air(h), Turbin aliran rata.
Ix
ABSTRACT
According from Minister of Energy and Mineral Resource (ESDM)
of Republic Of Indonesia Purnomo Yusgiantoro, expressing that mean of
insuffiency of supply electrics for the Jawa-Bali of equal to 600 MW
everyday from peak load/burden, deficitly equal to that, may simply
extinction surely will often happened.
Nation Research Agenda (ARN2006-2009) about new energy and
newly (EBT) elaborating about Perpres No 5 year 2006 to indicate of
existence of effort of make-up of new used energy.
This research purpose to know the potency of river natural kali
cokrobedog and of cannel irrigation vanderwijk of using to turbine of
low-velowcity water like sundermann types turbine .
The Principal of the stream turbine flatten the (low-velocity water) relied
on a water debit (Q),current speed (v),elevated place of river(h). For the
river of which its deepness exceed high the than blade of turbine use by
hang up. Result of the research to river of natural cokrobedog to got (Q)
= 1,07 m3/s, (v) = 0,77 m/s,dan (h)= 0.5- 08 m. and for irrigation river
got data (Q) = 2,63 m3/s, (v) = 0.82 m/s,dan (h)= 1,5-1.8 m.
Result of research demonstrate that potency of river natural can
be exploited as power plant by using turbine of low-velocity
water,(sundermann turbin types) if its current speed minimize 0,77 m/s,
elevated place of river min 0.8 m max 0.9 m, for to get the electric
energy equal to 125 watt.
Keyword : water debit ( Q), current speed Air(V), elevated
place of river (h) Turbine low-velocity water
x
Juni 2009
R 153.43 Dar s c.1 06.2009
153.43
Thesis
Indonesia
Magister Sistem Teknik UGM
2009
Yogyakarta
x, 82 hlm.; ilus.; 29 cm.
Disertai CD